Warehouse Put-Away Best Practices: From the Receiving Dock to the Bin

When supplier pallets sit on the receiving dock for two days, you have two problems: the dock is blocked, and your stores can't sell stock that is already in your building. Worse, when rushed staff finally put boxes on any open shelf without recording where, pickers spend hours hunting for them later.

A disciplined put-away process moves goods from the dock into exact, scanned spots, bins and pallets within hours, so stock can be picked right away and your records stay right.

Why slow or sloppy put-away hurts everything

  • Orders wait: online orders wait for stock while new boxes sit unrecorded by the dock.
  • Blocked receiving: when yesterday's delivery is still on the dock, today's truck can't unload.
  • Reordering what you already have: buyers reorder items they think are out of stock because received units were never scanned into bins.
  • Damage noticed too late: without a proper check at receiving, crushed cartons are found weeks later instead of being recorded on arrival.

Five principles of fast, accurate put-away

1. Check the count at the dock

Before anything goes on a rack, check the cartons or pallets against the purchase order or the client's advance notice. Note crushed boxes, water damage or shortages at the dock, and photograph any damage.

2. Top up pick bins first, store the rest

If a product's pick bin is running low, top it up first. Send the rest of the full pallets to upper racking or bulk floor spots, so pick aisles stay clear.

3. Put away by zone

Instead of walking from the dock to the far corner ten times with single cartons, load a cart sorted by aisle and put away twenty items in one loop.

4. Scan the product and the location

Never rely on memory or notes. A put-away is finished when the worker scans the product and then the spot, bin or pallet, so the system knows exactly where the units are.

5. Same-day put-away

Make it a rule that everything received before a set time (for example 2 PM) is checked, labelled if needed and scanned into place before the end of the shift.

Step by step: dock-to-bin routine

Step 1: Stage deliveries in labelled receiving spots

Unload into marked receiving spots (for example RCV-01, RCV-02) so incoming freight never mixes with outgoing parcels.

Step 2: Check barcodes and label if needed

Make sure every unit or case has a barcode. If the supplier sent items without one, print and apply your own labels at the receiving bench.

Step 3: Choose the location

Check where each product already lives. Put fast movers in waist-high bins near packing, and full reserve pallets in numbered pallet spots.

Step 4: Put away with scans

Walk the aisles in order, place stock neatly in its bin or pallet spot, and scan the location and the item.

Step 5: Record later moves the same way

When a reserve pallet later moves down to a pick bin, record the move with a quick scan from one location to the other.

Step 6: Count busy bins regularly with photos

Count active bins weekly with scans and photos to catch mistakes quickly.

Common put-away mistakes

  • Several products in one small bin without dividers: give each product its own bin unless they're clearly separated and labelled.
  • Partial pallets left unlabelled at the end of an aisle: give every partial pallet a proper spot and scan it in.
  • Skipping the routine for returns: returns approved for resale need the same scanned put-away as new stock.

How HAJEX Bolt handles put-away, moves and storage

  • Put-away and moves: move stock from receiving into labelled spots, bins and pallets, and record moves between them, with barcode scanning.
  • Spots, bins and pallets: exact quantities in every location, with clients kept separate in 3PL warehouses.
  • Picking, counts and returns: newly put-away stock is ready for Shopify, Amazon and WooCommerce orders, with counts with photos and organised returns.

Frequently asked questions

How quickly should received stock be put away?

Within the same shift if you can, and within a day at most, so it's available for orders and the dock stays clear.

Should new stock go into pick bins or pallet storage?

Top up pick bins first if they have room, and send the rest to reserve pallet spots.

How does scanning make put-away more accurate?

Scanning the product and the bin or pallet confirms the item is in the right place and updates your stock immediately.

How do 3PLs handle put-away for several clients?

In a multi-client system like HAJEX Bolt, each delivery belongs to a specific client, so pallets and bins are tracked under that client without mixing stock.

What happens when stock later moves from a reserve pallet to a pick bin?

Staff scan where it came from, the product and where it went, so the system updates the location right away.